ADVERTISEMENT FOR BIDS

 

OLIVE STREET AND BECKY STREET ROADWAY IMPROVEMENTS

FOR

LIBERTY COUNTY BOARD OF COMMISSIONERS

 

Sealed bids will be received by the at 112 North Main Street Hinesville, Georgia 31313 until 2:00 P.M. local time on July 13, 2021, at which time and place they will be publicly opened and read. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days.

 

The work to be done consists of removing approximately 105 square yards of existing asphalt and concrete on Olive Street and replacing it with 105 square yards of 8 inch concrete. The work also includes the removal and replacement of approximately 500 square yards of asphalt and base material on Becky Street.

 

Bids for the complete work in one or more general contracts shall be made on the bid form provided and shall contain prices in words and figures for the work bid.  All bids shall he accompanied by a Bid Bond drawn in favor of the Liberty County Board of Commissioners, in the amount of at least five percent (5%) of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the Liberty County Board of Commissioners. Each bond shall be equal to one hundred percent (100%) of the contract amount. The Bid Bond shall be forfeited to the Liberty County Board of Commissioners as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within ten (10) days after being notified that he has been awarded the contract.

 

Drawings and Specifications are open to public inspection at the office of the Liberty County Board of Commissioners and at the offices of T. R. Long Engineering, P.C.

 

Copies of the plans and specifications must be obtained from T. R. Long Engineering, 114 North Commerce Street, Hinesville, Georgia, 31313, upon receipt of $100.00. Such fees represent reproduction cost and are non-refundable. Bidders must purchase a Bid Packet to be a registered bidder. Only bids from registered bidders will be opened.

 

The Owner reserves the right to reject any or all bids and to waive informalitiesADDENDUM NUMBER ONE

TO

REQUEST FOR BIDS, CONTRACT DOCUMENTS, CONSTRUCTION

SPECIFICATIONS AND DRAWINGS

FOR CONSTRUCTION OF

 

Roadway Improvements for Cactus Street

for the Ware County Board of Commissioners

 

 

ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY INSERTING ITS NUMBER IN THE PROPOSAL. FAILURE TO DO SO MAY SUBJECT BONA FIDE PROPOSERS TO DISQUALIFICATION.  THIS ADDENDUM FORMS A PART OF THE PROJECT DOCUMENTS; IT MODIFIES THEM AS FOLLOWS:

 

  1. Please review the attached revised construction sheets C-3 and C-4. The schedule of items is to remain the same.  The following features were previously installed under a separate contract and should be excluded from the bid documents schedule of items:
    1. The entrance drive to parcel WA2510 008 at station 2+00.
    2. The entrance drive and drainage flume at stations 2+50/2+68 adjacent to parcel WA2510 006.
    3. The drainage flume at station 1+35 adjacent to parcel WA2512 003.
    4. Southern roadside curb & gutter from station 0+00 to station 2+73.

 

ADDENDUM NUMBER ONE

TO

REQUEST FOR BIDS, CONTRACT DOCUMENTS, CONSTRUCTION

SPECIFICATIONS AND DRAWINGS

FOR CONSTRUCTION OF

 

Roadway Improvements for Cactus Street

for the Ware County Board of Commissioners

 

 

ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY INSERTING ITS NUMBER IN THE PROPOSAL. FAILURE TO DO SO MAY SUBJECT BONA FIDE PROPOSERS TO DISQUALIFICATION.  THIS ADDENDUM FORMS A PART OF THE PROJECT DOCUMENTS; IT MODIFIES THEM AS FOLLOWS:

 

  1. Please review the attached revised construction sheets C-3 and C-4. The schedule of items is to remain the same.  The following features were previously installed under a separate contract and should be excluded from the bid documents schedule of items:
    1. The entrance drive to parcel WA2510 008 at station 2+00.
    2. The entrance drive and drainage flume at stations 2+50/2+68 adjacent to parcel WA2510 006.
    3. The drainage flume at station 1+35 adjacent to parcel WA2512 003.
    4. Southern roadside curb & gutter from station 0+00 to station 2+73.

 

ADVERTISEMENT FOR BIDS FOR
CACTUS STREET ROADWAY IMPROVEMENTS FOR
WARE COUNTY BOARD OF COMMISSIONERS
Sealed bids will be received by the WARE COUNTY BOARD OF COMMISSIONERS at 305 OAK STREET, SUITE 227 WAYCROSS, GEORGIA until 2:00 P.M. local time on March 23, 2021, at which time and place they will be publicly opened and read. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days.
The work to be done consists of construction of roadway improvements to Cactus Street. The proposed work includes grading, installation of graded aggregate base, asphalt pavement and drainage improvements. The length of the roadway improvement is approximately 1,140 linear feet.
Bids for the complete work in one or more general contracts shall be made on the bid form provided and shall contain prices in words and figures for the work bid. All bids shall he accompanied by a Bid Bond drawn in favor of the WARE COUNTY BOARD OF COMMISSIONERS, in the amount of at least five percent (5%) of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the WARE COUNTY BOARD OF COMMISSIONERS. Each bond shall be equal to one hundred percent (100%) of the contract amount. The Bid Bond shall be forfeited to the WARE COUNTY BOARD OF COMMISSIONERS as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within ten (10) days after being notified that he has been awarded the contract.
Drawings and Specifications are open to public inspection at the office of the WARE COUNTY BOARD OF COMMISSIONERS and at the offices ofT. R. Long Engineering, P.C.
Copies of the plans and specifications must be obtained from T. R. Long Engineering, 114 North Commerce Street, Hinesville, Georgia, 31313, upon receipt of $150.00. Such fees represent reproduction cost and are non-refundable. Bidders must purchase a Bid Packet to be a registered bidder. Only bids from registered bidders will be opened.
The Owner reserves the right to reject any or all bids and to waive informalities.

ADVERTISEMENT FOR BIDS

 

OLIVE STREET AND BECKY STREET ROADWAY IMPROVEMENTS

FOR

LIBERTY COUNTY BOARD OF COMMISSIONERS

 

Sealed bids will be received by the at 112 North Main Street Hinesville, Georgia 31313 until 2:00 P.M. local time on July 13, 2021, at which time and place they will be publicly opened and read. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days.

 

The work to be done consists of removing approximately 105 square yards of existing asphalt and concrete on Olive Street and replacing it with 105 square yards of 8 inch concrete. The work also includes the removal and replacement of approximately 500 square yards of asphalt and base material on Becky Street.

 

Bids for the complete work in one or more general contracts shall be made on the bid form provided and shall contain prices in words and figures for the work bid.  All bids shall he accompanied by a Bid Bond drawn in favor of the Liberty County Board of Commissioners, in the amount of at least five percent (5%) of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the Liberty County Board of Commissioners. Each bond shall be equal to one hundred percent (100%) of the contract amount. The Bid Bond shall be forfeited to the Liberty County Board of Commissioners as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within ten (10) days after being notified that he has been awarded the contract.

 

Drawings and Specifications are open to public inspection at the office of the Liberty County Board of Commissioners and at the offices of T. R. Long Engineering, P.C.

 

Copies of the plans and specifications must be obtained from T. R. Long Engineering, 114 North Commerce Street, Hinesville, Georgia, 31313, upon receipt of $100.00. Such fees represent reproduction cost and are non-refundable. Bidders must purchase a Bid Packet to be a registered bidder. Only bids from registered bidders will be opened.

 

The Owner reserves the right to reject any or all bids and to waive informalities