Skip to content

Lakeside Boulevard, Mulberry Avenue, & Market Boulevard Roadway Improvements

Port Wentworth, Georgia

Project Details

T.R. Long Engineering, P.C. provided professional services for the complete rebuild of Lakeside Boulevard, which was failing along its entire length. The subbase was replaced down to a depth of three feet; this included select fill material, geotextile fabric, sock drains, graded aggregate base, and asphalt. We deep patched the damaged areas and overlaid 1.5 inches of asphalt on Mulberry Avenue and Market Boulevard.