Skip to content

North Zetterower Street Sidewalks

Statesboro, Georgia

Project Details

T.R. Long Engineering, P.C. prepared construction plans for adding sidewalks on the east side of North Zetterower Street. The construction of sidewalks will begin at Hill Street and extend to Northside Drive (aka U.S. Highway 80). The project design includes relocating existing utilities, replacing curb and gutter, and adding handicap crossings as necessary for the new sidewalks. There are several locations where this project will require retaining walls to deal with the excessive grading at the road.

River to Tap, Inc., is providing environmental services for this project. These services to date are comprised of environmental documentation for concept development including NEPA discipline management, ecology discipline management, ecology and NEPA resource field location, ecology resources via flagging, photographs, and Global Positioning System of wetlands and streams within the approved Environmental Survey Boundary and within the project limits, as well as NEPA field verification of resources within the Environmental Survey Boundary. Additionally, River to Tap is responsible for environmental documentation and report writing, including preparing NEPA documents, agency coordination, preparing an Ecology Resource Survey Report and Assessment of Effects Report, preparing an Air Assessment Report, preparing traffic Noise Screening analysis, preparing Type III Noise Assessment Report, and reviewing and revising the above-mentioned reports following comments from the Georgia Department of Transportation.