Phillips Avenue Roadway & Drainage Improvements
Port Wentworth, Georgia
Project Details
T.R. Long Engineering, P.C. prepared construction plans for the complete rebuild of Phillips Avenue which was failing along its entire length. Phillips Avenue is in old town Port Wentworth and was built more than 70 years ago with a narrow-paved roadway, roadside ditches, and numerous utilities. The improvements included replacing the subgrade, base, and pavement for the entire length of roadway. The project included replacing the roadside ditches with curb and gutter and rebuilding the entire drainage system.