Radium Removal Water Treatment System
City of Scotland
Project Details
The City of Scotland’s groundwater source Well #2 had a contamination problem from radioactive materials which are not compliant with all Local, State, and Federal regulations. T. R. Long Engineering, P.C. served as the General Engineering Consultant. Mr. Long served as the project manager and design engineer. He also supervised bidding, contract administration, and construction observation. The project consisted of constructing a 300 GPM Package Radionuclide Removal Treatment System.